Approved master plan

TOURIST MASTER PLAN DESIGNATED IN THE TERRITORY OF THE "KARABAG" MFY OF THE CHARTAK DISTRICT, NAMANGAN REGION

  • Chortoq district
  • Reservoir surroundings
  • 60 ha

General plan

Detailed information on the master plan and engineering equipment indicators of the "Wellness City Chartok" tourist facility complex:

Power supply.
The power supply project was developed in accordance with PUE and ShNK (KMK) 2.07.01-23 norms, as well as the master plan at voltages of 10 kV and 0.4 kV.
The reliability degree of the power supply belongs to category II.
The required total capacity of the tourist complex is 11,470 kW.
It is planned to install a total of 7 complete transformer substations (KTP) with a capacity of 2x250 kVA each in the area.

Water supply and wastewater
In terms of drinking water supply, the water protection zone includes an area of not less than 50 meters along the banks of the reservoir.
Wastewater treatment plant for Chartok (LOS-500): the allocation area is 30x30 meters and the total cost is 9.8 billion soums.